Cost per hour calculator
for a machine.

Enter a machine’s data and you’ll see what each hour it produces costs you, adding what it costs to own and what it costs to run. No sign-up, and what you type stays in your browser.

In short
  • Enter your numbers and see a machine’s real cost per productive hour, and the minimum rate for the margin you want.
  • It also shows how far off you are if you divide by engine hours.
  • It’s free, with no sign-up, and what you type stays in your browser.

Work out your cost

Owning the machine (per year, unless stated)
Using the machine
Hours and your margin

Cost per productive hour—

Fixed part per hour
—
Running part per hour
—
If you divided by engine hours
—
Minimum rate with your margin
—

Fill in at least productive hours and one cost to see the result.

What the result is telling you

  • Cost per productive hour: what each hour it really works costs you. If your rate is close to it, you’re not earning what you think.
  • Fixed part: paid even when it’s stopped. The fewer hours it works, the more each one carries.
  • Running part: fuel, maintenance, wear and operator. It’s what moves most when the machine is misused.
  • If you divided by engine hours: the number you get counting idling and waiting. The gap with the real one is how far you’re fooling yourself.
  • Minimum rate: what you’d have to charge to keep your margin, before overheads.

What moves the number most

  1. Productive hours. Lower them and see how much the cost rises. A stopped machine is very expensive.
  2. Idling and waiting. They burn fuel and add wear, but produce nothing.
  3. Breakdowns. Include them all. “It was a one-off” is how a rate falls short.

Do it one machine at a time: fleet averages hide the ones losing money. To understand each item, read how to calculate a machine’s cost per hour.

If you don’t know your productive hours

That’s the most common case, and what changes the result most. You can estimate them from job sheets. To make them reliable, they have to be recorded: we cover it in how to track heavy machinery hours. It’s one of the things remote machinery monitoring solves.

Sound familiar? See how we solve it in remote machinery monitoring or tell us about your case directly.

Tell us about your case↗

Questions,
on the table.

How do you calculate a machine’s cost per hour?

Add a year’s fixed costs, running costs and operator, then divide by that year’s productive hours.

Why not use engine hours?

Because they include idling and waiting, which don’t produce. Divide by them and the cost comes out lower than it is, so your rate falls short.

Do you store the data I enter?

No. The calculation runs in your browser and nothing is sent. Reload the page and it’s gone.

Does it include overheads?

No. Only the machine’s costs. If you want your rate to cover them, add them separately or spread them across your machines.